The Discovery Sprint · £25,000 fixed

Two weeks from your data to a board decision.

Nothing installed. The clock starts when your data lands, not when the contract is signed.

The path

Each step earns the next.

The sprint fee is the only commitment you make on day one.

Step 1 · Discover

The Discovery Sprint

Your logs and documents mined into a measured opportunity map and a board-grade case, with a costed Phase 1 on the table at the playback.

2 weeks · £25k fixed
Step 2 · Build

Phase 1

The first workflows live behind a test suite mined from your own cases, with the review console and integrations. All inference in your tenant.

8–12 weeks · £80–120k · half the sprint fee credits
Step 3 · Run

The operating cycle

Every live workflow reports its KPIs monthly, reviewer feedback flows back into the agents, and a new workflow bucket ships each quarter.

ongoing · from £8k a month
Method

Fourteen days, indexed to your data.

Three passes over the history you already hold. Your senior people validate the findings rather than supply them.

Week 0

Pre-flight

Data-request pack to your IT owner, DPA signed, in-tenant environment stood up.

Days 1–3

Measure

The full activity log through the pipeline: hours by work family, lifecycle stage and artifact.

Days 4–6

Read the work

Two-source AI classification, notes plus documents, all in your tenant. AI-assistant sessions add a third source where you have them.

Days 7–8

Validate

Savings assumptions pressure-tested in two short sessions with senior practitioners.

Days 9–10

Size and decide

The board case played back live. You end the meeting with a decision, not a report.

Why two sources

30% → 85%

Activity notes alone classify about 30% of work correctly; the median note is one to four words. Reading the produced documents alongside them lifts accuracy to about 85%, validated on an hours-weighted sample and published in your analysis.

Already on Copilot

A data source, not a competitor

Copilot logs show what your people are already trying to automate and which inputs they paste in by hand. That exhaust becomes part of the roadmap.

Your time

About six hours, total

A named data owner for a few hours in week 0, two short sessions with senior practitioners in week 2, and your sponsor at the day-10 playback.

Pricing

Priced up front. Guaranteed in auditable units.

Half the sprint fee credits against a Phase 1 commissioned within 90 days.

Then · Step 2

Phase 1 build

First workflows live behind their test suite, with the review console and integrations.

8–12 weeks · typically £80–120k
Then · Step 3

Operating cycle

KPI monitoring, the feedback flywheel, and a new workflow bucket each quarter.

ongoing · from £8k / month
The first run

The first run of this sprint sized £1.66m a year, was approved by the client's board, and converted into a commissioned £82k Phase 1 returning £207k a year. A named reference is available on the readiness review, subject to the client's confidentiality preferences. For context, the conventional route to this answer is a consultancy discovery phase at a multiple of the sprint fee, producing estimates rather than measurements.

£25,000 fixed
Two weeks from first data delivery. 50% credits against a Phase 1 build commissioned within 90 days.

Included

  • Week 0 pack: data-request specification, DPA, security one-pager for your DPO
  • In-tenant analysis environment. Your content never leaves your cloud
  • All four deliverables plus every underlying dataset and assumption, yours to keep
  • Two SME validation sessions and a live board-ready playback with your sponsor
  • A costed, scoped Phase 1 proposal, priced on the table at the playback

The guarantee

If week 1 does not identify at least £250,000 a year in modelled savings, recoverable hours priced at your own blended cost per hour from your own logs, we stop and you pay half. The sizing model is part of your deliverable, so you can audit the verdict. You keep the analysis either way.

Fair questions

What you're probably thinking.

Nowhere. All AI processing of your content runs on models deployed in your tenant (Azure AI Foundry); session analysis returns aggregate counts, never transcripts; people are pseudonymised on ingest; and analysis is at the work-family level. This is not employee monitoring. The one-page security summary for your DPO is available before any data moves.

Good. That is a data source, not a competitor. Your Copilot logs show exactly what your people are already trying to automate, how many attempts it takes, and which inputs they paste in by hand. In our work so far, 80–90% of session iteration is drip-fed missing context, which tells you precisely what to integrate.

Then they will be the sprint's best customer. The deliverables include every dataset, taxonomy and assumption, a measured foundation your team can build on rather than a black-box recommendation. Most internal teams have the skills but not two clear weeks or a proven pipeline. The Phase 1 that follows can be built by us, by them, or jointly.

Two ways. It is measured: numbers built bottom-up from millions of logged rows, with the classification accuracy published, not estimated in workshops. And it is written by the person who builds these systems, eval-gated agent platforms running today inside an airline, advisory firms and financial services. The roadmap is a build plan, not a think piece.

Those tools install capture software and watch work from now on. You deploy agents to desktops, wait weeks or months for telemetry, and get recommendations at the end. We mine the history your firm already holds, with nothing installed and no screen-level monitoring, so the board-grade number exists in two weeks. And we don't stop at recommendations: the same engagement carries through to building and running the agents behind their gates.

Less than you'd think: a named data owner for a few hours in week 0 and two short calls; two 60–90 minute sessions with senior practitioners in week 2; and your sponsor at the day-10 playback. The sprint is designed to consume our time, not your team's.

A costed Phase 1 is on the table: one or two workflows taken live behind their test suite in eight to twelve weeks, half the sprint fee credited if commissioned within 90 days. Build with someone else, or in-house, if you prefer; everything you need to brief them is in the deliverables. There is no lock-in by design.

A fair question, and the delivery model is built around it: every artifact is versioned and documented as we go, runbooks and an extension playbook are part of every build phase, and the platform, datasets and evaluators are yours. Any competent engineering team could pick up where we left off. Build phases can draw on trusted associate engineers, and continuity and insurance arrangements are set out during contracting.

Roughly 50–1,000 fee-earners, advisers or handlers doing document-centric work: advisory, broking, compliance, accountancy, legal services, property management. A case-management system is ideal but not required. Microsoft 365 firms without per-activity logging get the three-week modelled variant. Firms whose work leaves no digital trail get interviews and an instrumentation plan, and we will tell you that honestly on the first call.

Find out what your logs already know.

Thirty minutes. We tell you whether your data can carry a sized case, and you leave with a written verdict either way.

Direct: dmezzinasamuels@gmail.com. Replies within one working day.

Discovery Sprint£25,000 fixed · 2 weeks
Phase 1 build£80–120k · 8–12 weeks
Operating cyclefrom £8k / month
Sprint credit50% against the build
Sample findings packrequest →